• PALAZZO UFFICI

    OFFICE BUILDING'S ENLARGEMENT

    Flero, Brescia, IT, 2012

    The intervention extends and completes the Metalleghe office building, through the inclusion of a volume similar to the first, on the south side, fully glazed with structural facade and "suspended" in a bay with metal lattice structure with two pairs of steel columns resting on the ground. The color choice is the same as the rest of the building. The new volume is placed on the second floor, is connected to the main building through two gangways closed and glazed, and is divided into offices by movable walls. The floor access is guaranteed by the stairwell with elevator located in the main building.

  • PALAZZO UFFICI
  • PALAZZO UFFICI
  • PALAZZO UFFICI
    Client
    Metalleghe S.p.A.
    AREA
    200 MQ
    CHRONOLOGY
    2008: project; 2011-2012: realization
    WORK
    Architectural design and structural design, construction management, accounting, safety (CSP-CSE), energy certification