-
FORSTEEL S.r.l. OFFICE BUILDING
Offlaga, Brescia, IT, 2013The intervention concerns the construction of an office building related to productive activity within a batch of 20.000 mq, in which there are also a shed for storage and processing, a weigh-in, the accessory rooms and ample parking with space for the handling of large vehicles. The office building, on two levels, has concrete main structure, flat covering and brick masonry brick with insulation into the gap. On the ground floor there is the main entrance with reception, changing rooms, toilets, showers, laboratory and canteen service, on the first floor there are the administrative offices and the meeting room.
-
>
-
Client
Forsteel S.r.l.
Area
520 MQ
Chronology
2012: project, 2012-2013: realization
WORK
Architectural design, construction management, safety (CSP-CSE), accounting